Ridgedale Center has undergone some major reconstruction this year and should be on track for completion just in time for back to school shopping! #ridgedaletransformation

Before 1

 

To make way for the grand re-opening this fall 2015, Bituminous Roadways, Inc. was contracted to rehabilitate some of the parking lots surrounding the mall.

The method chosen to rehabilitate the Macy’s parking lot was a 2” mill and overlay.

 

 

A mill & overlay is completed by “milling” (grinding) off the top 2” of old/deteriorated asphalt with a milling machine and replacing it with 2” of new asphalt using a paver.  The rubble asphalt is hauled back to one of our asphalt plants to be recycled into new pavement.

Mill 2

Paving

After the wear course is put in place and adequately compacted, pavement markings are painted onto the new surface.

After 3After 1

 

 

Bituminous Roadways, Inc.
(651) 686-7001
1520 Commerce Drive
Mendota Heights, MN 55120

Recent Blog Posts

  • The Benefits of Recycled Asphalt

    Did you know in the early 1990’s, the Environmental Protection Agency and the Federal Highway Administration reported to congress that asphalt pavement was America’s number one recycled product? Who knew? Bituminous Roadways, Inc. (BR) did. Well before this report, since the early 1970’s actually, BR has been incorporating recycled asphalt pavement (RAP) ...